Complex Exterior Painting

Tela Verde Apts in Glendale, AZ

Overview of the Project

The extensive exterior painting and repair project at Tela Verde Apartments located at 5020 W. Thunderbird Road, Glendale, AZ 85306 showcases the commitment to excellence by Gilbert’s Arizona Painting Contractors Commercial & House Painters. 

This transformative project reflects meticulous attention to detail, quality craftsmanship, and a focus on enhancing the overall structure and appearance of this substantial 196-unit apartment complex. 

With a project budget of $182,974, this undertaking includes comprehensive repairs and premium painting, ensuring the complex is well-protected and aesthetically appealing for years to come.

Project Background and Objectives

Tela Verde Apartments is a large residential complex that has weathered the passage of time and exposure to Arizona’s challenging climate. The last major renovation had left parts of the property in need of an extensive overhaul. This project was initiated to address issues such as wood rot, roof leaks, and the general wear and tear on exterior surfaces.

Core Objectives of the Tela Verde Project

  • Structural Restoration and Safety: Replace rotting fascia boards, chalices, and other wooden components, ensuring safety and structural soundness.
  • Visual Revitalization: Apply a high-quality, three-color paint scheme for a fresh and modern aesthetic.
  • Enhanced Protection and Durability: Use premium products, including DTM (Direct to Metal) and alkaline paints, to coat metal structures and protect them from rust and weather damage.
  • Comprehensive Repairs: Undertake extensive drywall repairs to address ceiling issues in several units and perform patching to ensure seamless finishes.
  • Resident Satisfaction and Minimal Disruption: Coordinate efficiently to communicate with residents and minimize disruptions during the project timeline.

Detailed Scope of Work

Tela Verde Apts in Glendale, AZ

The project encompassed a wide range of tasks that highlighted Gilbert’s Painting’s expertise in not only painting but also in repair and preparation.

Full Exterior Painting and Coating

  • Comprehensive Exterior Coverage: All stucco buildings, carport covers, support beams, perimeter walls, and pony walls were treated with Behr E600 Pro Premium Flat Paint and Behr Exterior Multi-Surface Primer & Sealer.
  • Three-Color Scheme Application: A thoughtfully chosen color scheme revitalized the appearance of the complex, enhancing its curb appeal and modernity.
  • Metal Railings and Structures: All pool and view fencing, playground posts, and gates received a durable coating of Behr DTM (Direct to Metal) Paint to ensure long-lasting protection against weather and wear.

Wood and Structural Repairs

  • Extensive Wood Repairs: The project involved replacing rotting fascia boards, chileses, and veins, with a total investment of $468,000 dedicated to wood and drywall restoration.
  • Roof Leak Remediation: Addressed and repaired areas affected by roof leaks, which required replacing sections of drywall and wooden structures.
  • Plywood Replacement: Specifically, Unit #117 required an 8 x 12 sheet of plywood to be replaced as part of the detailed repair efforts.

Drywall and Concrete Repairs

  • Interior Drywall Work: The project covered repairs in the ceilings/lids of 17 specific units, including units #101, #104, #106, #110, #112, #115, #117, #141, #148, #162, #192, #193, #207, #208, #219, #220, and #222.
  • Patching and Seamless Integration: Ensured all repaired areas were patched and blended seamlessly into existing structures to provide a flawless look.
  • Concrete Repairs: Addressed any damage on the building exteriors, ensuring that all surfaces were stable and ready for paint.

Specialized Painting for Metal Surfaces

  • DTM and Alkaline Paints: Used specialized DTM and alkaline paints on metal surfaces, including railings and playground posts, to provide resistance against rust and corrosion while maintaining a smooth, professional finish.
  • Gutter and Vent Covers: Repainted to match the new color scheme and protect against future weathering.

Community and Communal Areas

  • Pool and Recreational Areas: Pergolas, pool equipment enclosures, and ramadas were repaired and painted to maintain a welcoming communal atmosphere.
  • Entry Signage and Dumpster Enclosures: Refreshed the front entrance sign (stucco only, without lettering) and repainted dumpster enclosure walls and gates to ensure the entire complex projected a clean and maintained appearance.

Preparation and Job Site Management

Tela Verde Apts in Glendale, AZ

The preparation phase was pivotal to the success of the Tela Verde Apartments project. Gilbert’s Painting emphasizes thorough job site preparation, knowing that this step is key to achieving long-lasting results.

Preparation Steps Undertaken

  • Rock and Soil Trenching: Pulled back landscape rock approximately 2-3 inches to expose the lower grade of the foundation, ensuring paint application reached the necessary areas.
  • Pressure Washing: Cleaned all surfaces to remove dirt, oxidation, and debris, creating an ideal base for the primer and paint.
  • Masking and Taping: Protected unpainted surfaces, such as windows, walkways, and doors, to prevent overspray and ensure clean lines.
  • Application of Elastomeric Caulking: Sealed windows, fascia boards, and cracks to minimize air intrusion and prevent water damage.
  • Scraping and Spot Priming: Hand-scraped loose or peeling paint and spot-primed affected areas to achieve a uniform surface for painting.

Job Site Management and Safety

  • On-Site Foreman: An English-speaking foreman was present daily to oversee the work, ensuring it met quality and safety standards.
  • Employee Standards: All painters were W-2 employees, verified through the E-Verify system, uniformed, and trained for specific job tasks.
  • Insurance and Compliance: The project was covered by general liability insurance, and all safety regulations were met to protect both the crew and the residents.

Overcoming Challenges with Expertise

Tela Verde Apts in Glendale, AZ
Wood Rot and Structural Damage

The extent of wood rot in fascia boards and other wooden elements presented a significant challenge. Gilbert’s Painting tackled this with precision, replacing damaged areas and reinforcing the structural integrity of the affected buildings.

Repairing Roof Leak Damage

Roof leaks had led to extensive drywall damage in multiple units. The team effectively replaced and patched these areas, ensuring that the interior ceilings were restored to their original condition.

Maintaining Resident Comfort and Safety

Minimizing disruption for residents was essential. Communication strategies included management-provided notices and updates to keep tenants informed throughout the project’s duration.

High-Quality Products and Warranty Information

Superior Paints and Materials

  • Behr E600 Pro Premium Paints: Chosen for their durability and rich finish, suitable for Arizona’s demanding climate.
  • DTM and Alkaline Paints: Specialized for metal surfaces to prevent rust and provide lasting protection.

Warranty and Assurance

  • Manufacturer’s Warranty: All paint products come with a certified warranty from Behr.
  • Workmanship Warranty: A three-year workmanship warranty covers issues related to the painting process (excluding normal wear and external damage).

Communication and Resident Notification

Gilbert’s Painting collaborated closely with property management to notify residents through posted door notices and other means, in line with Arizona tenant law notice timeframes. This ensured that residents were aware of project timelines and any potential disruptions.

Project Execution Plan and Final Review

Initial Preparation Phase:
  1. Detailed Inspection and Assessment: A full review of all areas to be repaired or painted.
  2. Surface Preparation: Cleaning, priming, and repairing all surfaces to establish a strong base.
Painting and Finishing Phase:
  1. Professional Application: Utilized advanced techniques for consistent, high-quality results.
  2. Detail-Oriented Painting: Focused on ensuring even coverage on all painted surfaces, including challenging areas like pergolas and railings.
Final Inspection and Quality Assurance:
  1. Thorough Review and Touch-Ups: Addressed minor imperfections and ensured the project met the highest standards.
  2. Resident Feedback: Invited resident feedback and completed final touch-ups as necessary.

Conclusion and Lasting Benefits

The Complex Exterior Painting project at Tela Verde Apartments by Gilbert’s Arizona Painting Contractors delivered a comprehensive revitalization of the property. Through expert wood repairs, high-quality paint application, and careful preparation, the project not only enhanced the visual appeal of the complex but also fortified its structural integrity. With a focus on safety, quality, and resident satisfaction, Tela Verde Apartments now stands refreshed and protected, promising years of sustained beauty and durability.

(480) 495-1675